In gas turbine Heat Recovery Steam Generators (HRSGs), economizer steaming is a common challenge—especially during low or part-load operation.
When exhaust gas temperature drops (e.g., 385°C vs. 500°C), steam generation in the evaporator and superheater decreases. The economizer, however, still absorbs significant enthalpy due to unchanged gas-side flow. As a result, the feedwater reaches saturation temperature, forming steam bubbles inside economizer tubes.
⚠️ Why is this a problem?
- Tube vibration
- Salt deposition and fouling
- Flow blockage
- Reduced efficiency and reliability
✅ How to Prevent Steaming in HRSG Economizers
Engineers and operators can apply several strategies:
- Increase blowdown rate → Boosts mass flow through tubes, reducing steaming during short-duration events.
- Supplementary firing → Raises exhaust gas temperature, increasing steam generation and stabilizing economizer operation.
- Relocate feedwater control valve → Positioning it between economizer and evaporator raises operating pressure, increasing saturation temperature above exhaust gas temperature.
- Optimize tube flow direction → Ensure steaming surfaces have upward water flow so bubbles can escape smoothly.
- Gas-side bypass → Reduces economizer duty (though at the cost of efficiency).
- Partial water-side bypass → Diverts a fraction of feedwater to control outlet temperature and avoid steaming.
References: Heat Recovery Steam Generator Technology, V Eriksen.
Photo: Research Gate
0 Comments